Aleya

Turn farm waste into power and profit.

We measure your cattle farm, design a biogas system around it, and your manure starts paying your electricity bill.

Request a Free Farm Assessment→

[X] farms powered · [X] kWh generated

[Partner logo][Certification][Media feature][NGO partner][Bank partner][Partner logo][Certification][Media feature][NGO partner][Bank partner]

Real farms. Every figure on this site comes from measured installations.

Assessed first. No sizing guesswork: we measure before we quote.

Warranty in writing. [X]-year performance promise.

Your farm is losing money twice.

৳[X]spent on grid power or diesel every month
[X] hrsof load-shedding that stop milking and cooling
[X] tof manure a year that smells, pollutes and earns nothing

Unmanaged manure also releases methane, a gas far stronger than CO₂.

Waste. Then energy. Then growth.

Waste

Manure your cattle already make every day.

Energy

Biogas is cleaned and runs a generator on your farm.

Growth

Lower bills, plus bio-slurry fertilizer you can sell or use.

Five steps to power on.

1

Farm assessment

We measure waste and energy potential. You get a written report.

Free · [X] days
2

Custom design

A system sized to your herd and your budget.

[X] days
3

Installation

Reactor, gas cleaning and generator built on site.

[X] weeks
4

Power on

We commission the system and train your team.

[X] days
5

Monitoring and support

Remote checks and a local technician when you need one.

Ongoing

Proof, in numbers.

Placeholders marked [X] are replaced with measured results. We will not publish numbers we cannot show.

0maximum herd size per system
[X]%average electricity cost reduction
[X]kWh per day per farm
৳[X]average monthly saving
[X] yrspayback period
[X] tCO₂-equivalent avoided
[X]%system uptime
[X]farms served

What could your herd earn?

Estimate only. Assumes 0.8 m³ biogas per cow per day, 1.5 kWh per m³, and ৳10 per kWh. Your assessment gives the real figures.

Biogas per day

0 m³

Electricity per day

0 kWh

Estimated saving per month

0


Get my real numbers →

The Aleya ASMR™ reactor.

Manure inASMR™ reactorGas cleaningGeneratorBio-slurryElectricity

Self-cleaning

Less manual work and fewer shutdowns.

Slurry recirculation

Keeps the reactor working steadily.

Water recycling

Uses less water, lowers running cost.

Three farms, three stories.

Farm photo

[Farm name], [District]

[X] cattle · [system] · saving ৳[X] a month. “[Owner quote]”

Farm photo

[Farm name], [District]

[X] cattle · [system] · saving ৳[X] a month. “[Owner quote]”

Farm photo

[Farm name], [District]

[X] cattle · [system] · saving ৳[X] a month. “[Owner quote]”

More than electricity.

Fertilizer income

Bio-slurry feeds your fodder or sells to neighbors.

Cooking gas

Spare biogas can replace LPG at home.

A cleaner farm

Less smell, flies and runoff.

Lower emissions

Methane is captured, not released.

Incentives

[Green financing and subsidy options, to be confirmed.]

Owners say it best.

Video testimonial

“[Quote]”

[Name], [Farm], saves ৳[X] a month

Photo

“[Quote]”

[Name], [Farm], saves ৳[X] a month

Photo

“[Quote]”

[Name], [Farm], saves ৳[X] a month

Engineers who walk your farm.

Portrait

[Name]

[Role, credentials]

Portrait

[Name]

[Role, credentials]

Field photo

[Name]

[Role, credentials]

Standards and warranty: [certifications], [X]-year performance guarantee, [X]-month after-sales service.

Clear costs, no surprises.

Packages for farms of 10 to 100 cows. Your assessment gives the exact quote.

Essential৳10 lacs

Payback: [X] years

Advance৳15 lacs

Payback: [X] years

Enterprise৳22 lacs

Payback: [X] years

Financing partners: [Bank / NGO / leasing options].

Questions farmers ask.

How much does it cost?

Packages start at ৳10 lacs. The exact price depends on your herd and is given after the free assessment.

Is biogas safe?

Yes, when built correctly. [Safety features and standards.]

How much maintenance is needed?

The reactor is self-cleaning. [Routine tasks and service schedule.]

How many cattle do I need?

Our systems are designed for farms with 10 to 100 cows. We confirm sizing during assessment.

Are there subsidies?

[Current incentives and financing options.]

How long does installation take?

[X] weeks from design approval.

What if it fails?

Our warranty and local support cover this. [Terms.]

Get your free farm assessment.

Aleya Energy

Farm waste to electricity.

[Address]
[Phone] · [Email]

[Map embed]

[Facebook] · [YouTube] · [LinkedIn]

© Aleya Energy · [Privacy] · [Terms]